partners
Stand: NE-1
Company: AREVA T&D KAZAKHSTAN, LLP
Address: 42 Timiryazev street, Almaty, 050057
Country: Kazakhstan
Tel: + 7 727 25062 18
Fax: + 7 727 2507927
AREVA T&D is a world leader in manufacturing the equipment and providing system solutions for power transmission and distribution. AREVA T&D is a world leader in manufacturing the equipment and providing system solutions for power transmission and distribution. Areva T&D, one of the three world leaders in power transmission and distribution, is positioned as follows: №1 manufacturer of energy-oriented software №2 manufacturer of automation systems, transformers and high voltage equipment №3 manufacture of medium voltage equipment, service provider and implementing agency of power supply projects AREVA T&D is umbrellaed by AREVA Group which focuses on engineering, producing and supplying the equipment for nuclear power industry, package solution for turnkey project. Through 67 manufacturing units in 40 countries and commercial outlets in over 100 country throughout the world, AREVA T&D produces and supplies equipment and automation systems designed to transmit and distribute the energy. AREVA T&D Kazakhstan LLP, founded with 100% participation of AREVA T&D SA, was registered in April 2004 and as of that date has been representing the parent company’s interest in Kazakhstan and Central Asia. High manufacturing quality of AREVA-branded equipment is ensured by advanced technologies and effective quality managements system certified as better compliant with ISO 9001-2000 AREVA T&D designs and supplies a full scope of equipment, system solutions and service for power exchange projects acting as a full package supplier what is very important when engineering and implementation are concerned. For the time being AREVA T&D Kazakhstan participates in KEGOC-governed modernisation project (delivery of circuit breakers 220-500kV, disconnectors 110kV, 220kV, 500kV, instrument transformers). In Kazakhstan AREVA has successfully implemented turnkey projects – delivery, commissioning and putting into exploitation the substations as follows: 110/11/6/0,4 kV gas-turbine substation for TengizChevroil Company (Tengiz oil field) 110/11/6/0,4 kV gas-turbine substation for Karachaganak Petroleum Operating 500kV Aksu GRES Extension Reconstruction of 110/10kV substation in Astana-city, Delivery of 110kV and 10kV equipment for Katco JV Containerised substations 35/10kV for Tengizchevroil Engineering and construction of external power supply for Varvarinksyoe JV (110kV bay at SS Lisakovka, construction of 110/10kV two-transformer SS Varvarinskoye) Construction of 500kV&220kV for Kazakhstan Electrolysis Plant. 220kV and 110kV equipment for railway substation of Kazakhstan Temir Zholy Company 110kV&10kV equipment for KazAtomProm-governed project on power supply High voltage equipment for KEGOC-governed projects – “500kV North-South” and “500kV North-West” External power supply for Voskhod nickel deposit

Technical Support
Kcell
Useful Links